Leading CAD Outsourcing Company offers solutions of Engineering CAD Services, Design Drafting & 3D Modeling
←  Back to MEP Case Studies

3D BIM Coordinated Model for Healthcare Construction

Coordinated 3D BIM model at LOD 300 using Revit for Healthcare Construction, Australia

Client Profile: Design Drafting Company
Industry:Hospital Construction
Inputs:2D Plumbing Drawings
Deliverables:3D Coordinated BIM model
Software Used:
Autodesk Revit
big-mep-bim-services-healthcare-construction.jpg

Let’s Talk.

Are you tackling challenges in your projects? Talk to us about how our BIM modelling capability could help you get answers faster.

Connect with Us →

Business Needs:

  • Develop an accurate and fully detailed LOD 300 BIM model to represent plumbing and hydronic designs.
  • Execute precise 3D coordination for a large-scale commercial healthcare facility.
  • Deliver a clash-free, construction-ready BIM model to support planning and installation workflows.
  • Enhance design accuracy through improved visualization and model-based collaboration techniques.

Project Challenges:

  • Use 2D input drawings to execute clash detection and comprehensive resolution workflows.
  • Ensure coordinated modeling while preserving system functionality and original design intent.
  • Maintain required MEP clearance during architectural and structural coordination.
  • Deliver a conflict-free model to support efficient and uninterrupted construction execution.

Our Solutions and Approach:

A Design Drafting Company from Australia approached TrueCADD to deliver a fully coordinated 3D BIM model at LOD 300 using Revit for Healthcare construction.

  • Developed a high-accuracy coordinated LOD 300 BIM model using Revit.
  • Reviewed 2D drafts to generate precise and information-rich 3D BIM models.
  • Analyzed MEP layouts with architectural and structural plans to detect potential design clashes.
  • Resolved coordination issues through systematic clash detection, reporting, and resolution workflows.
  • Delivered a fully coordinated and clash-free 3D BIM model for construction-ready planning.

Business Impact:

  • Shared QC-verified 2D drawings, 3D models, and detailed MEP layouts
  • Coordinated underground and upper-floor drainage systems with improved accuracy and constructability
  • Enabled informed MEP design decisions through enhanced model visibility and reduced rework

Project Samples

Underground Drainage Underground Drainage
Upper Floor Drainage Upper Floor Drainage

Related Case Studies

Need help on an ongoing basis?

We establish long term business relationships with clients and are committed to total customer satisfaction.