Leading CAD Outsourcing Company offers solutions of Engineering CAD Services, Design Drafting & 3D Modeling
←  Back to BIM Services Case Studies

Revit Automation using Dynamo for Housing Corporation

Revit automation using dynamo with GIS linking for housing corporation, Europe

Client Profile:Architectural and engineering services company
Industry:Property Owners / Housing Corporation
Inputs:2D drawings & notes
Deliverables:3D BIM models at LOD 200
Software Used:
Autodesk Revit Autodesk Dynamo Studio
Final Deliverables in Dynamo

Let’s Talk.

Ready to enhance your BIM workflows with Dynamo-powered automation and data-driven Revit modeling?

Contact Our BIM Experts →

Business Needs:

  • Develop 300 LOD 200 Revit BIM models for facility asset management.
  • Enable automated generation of 2D façade drawings, floor plans, and BOQs from BIM data.
  • Allow data extraction and linkage with real estate information sheets for online integration.
  • Integrate BIM with GIS for spatial visualization and portfolio management.

Project Challenges:

  • Low-quality and inconsistent 2D inputs impacted model accuracy and data integrity.
  • Encountered language localization issues in annotations and documentation.
  • Ensured regulatory compliance through continuous technical upskilling.
  • Required scalable resources to manage varying project workloads.

Our Solutions and Approach:

A European architectural and engineering services provider partnered with TrueCADD to automate Revit BIM model creation using Dynamo scripts and connect them with GIS-based property data for online asset tracking.

  • Developed a digital property inventory of 300 buildings in Revit BIM (LOD 200) integrated with GIS data for asset management.
  • Validated BIM model prototype using Revit API scripts to ensure accuracy and standard compliance.
  • Used Dynamo automation to replicate validated models and rapidly generate BOQs, façade views, and floor plans.
  • Applied GIS coordinates to link property data with BIM models for spatial and operational integration.
  • Extracted real-estate data from BIM models to develop digital sheets for online portfolio management and uploads.

Business Impact:

  • Reduced project delivery time by 50%
  • Achieved 18% cost savings with BIM automation
  • Ensured 100% model accuracy and quality control
  • Improved BIM data management through digital property integration

Project Samples

Final Deliverables in Dynamo SOR Test Final Deliverables in Dynamo SOR Test
Final Deliverables in Dynamo Parameter Test Final Deliverables in Dynamo Parameter Test
Final Deliverables in Dynamo Final Deliverables in Dynamo

Related Case Studies

Need help on an ongoing basis?

We establish long term business relationships with clients and are committed to total customer satisfaction.